Land and Sea Surveying Concepts, INC.1605 CHASE HAMMOCK ROADMERRITT ISLAND, FL. 32953PHONE: 321.454.6310 FAX: 321.454.6998
Land & Sea Surveying Concepts was founded in 1992 by Tim Carlile, who remains as the President today. We began as a small firm performing local residential boundary surveys. Today, we are one of the most technologically advanced firms in the State, while remaining committed to customer service. Land & Sea Surveying continues to invest in the latest advances in equipment to provide our clients with an efficient and accurate product every time.
November 2021: National Parks Service Contract Lake Powell
Land & Sea Surveying performed a survey and dive inspection of the docks at the Antelope Point Marina in Lake Powell, AZ.
November 2021: National Parks Service Contract Lake Powell
Land & Sea Surveying performed a survey and dive inspection of the docks at the Antelope Point Marina in Lake Powell, AZ.
November 2021: Lehigh Slag Processing Plant at Port Canaveral, FL
Land & Sea Surveying performed a topographic survey of the Lehigh Slag Processing Facility in Port Canaveral, FL.
November 2021: Stennis Space Center
Land & Sea Surveying performed a topographic survey at two sites at the Stennis Space Center in Mississippi.
November 2021: GEN H2 Boundary and Topo
Land & Sea Surveying performed a boundary, topographic, tree count, and aerial drone survey of a site to be developed in Titusville, FL.
September 2021: Diego Garcia
Land & Sea Surveying performed a topographic and underground utility locate survey on the island of Diego Garcia in the Brittish Indian Ocean Territory.
September 2021: Suwannee River Water Management Benchmark Surveys
Land & Sea Surveying provided surveys for 18 gauge sites within the management district. Benchmarks were set and elevations were established on the gauges, measuring points, benchmarks, and reference points.
August 2021: Boundary and Legal Descriptions for Canaveral Port Authority
Land & Sea Surveying performed boundary surveys and prepared legal descriptions for five lease parcels at Port Canaveral in FL. An aerial drone was also flown and current aerial images were collected of the sites. An orthomosaic image was created for the sites.
August 2021: Converter Compressor Facility As-Built
Land & Sea Surveying performed an as-built survey of liquid nitrogen pipes and valves at a converter compressor facility for Air Liquide in Merritt Island, FL.
August 2021: Little Harbor Marina
Land & Sea Surveying performed a singlebeam hydrographic survey of the Little Harbor Marina in Ruskin, FL.
August 2021: BSL Assisted Senior Living Facility
Land & Sea Surveying performed a boundary, topographic, and tree count survey for a senior living facility in Titusville, FL.
July 2021: Port Everglades Multibeam Survey
Land & Sea Surveying performed a hydrographic survey of an area offshore of Dania Beach, FL. The data was processed to determine bottom classifications as well.
July 2021: Space View Park
Land & Sea Surveying performed an as-built and aerial drone survey of the construction at Space View Park in Titusville, FL.
July 2021: Faro Blanco Marina
Land & Sea Surveying performed a singlebeam hydrographic survey of the Faro Blanco Marina in Marathon, FL.
July 2021: CCSFS Fire Station Access Drive
Land & Sea Surveying provided a survey for the redesign of the fire station access driveway at Cape Canaveral Space Force Station as part of the TRACES contract
June 2021: Double Eagle Ranch Boundary
Land & Sea Surveying completed a boundary survey to split out 138 acres from parent tract and write a legal description for transfer.
June 2021: Land Clearing on North Merritt Island
Land & Sea Surveying cleared perimeter of 3-acre parcel
June 2021: Lori Wilson Park, Cocoa Beach
Land & Sea Surveying provided topographic surveys of both the north and south parks for renovation design.
June 2021: Millennium & Bicentennial Beach Parks, Indian Harbor Beach
Land & Sea Surveying surveyed both parks for upgrades to meet ADA requirements.
May 2021: Drone Survey of Coconut Point at Sebastian Inlet
September 2020: Data Sampling in Waccasassa River
Land and Sea Surveying sampled and collected hydrologic data on the Waccasassa River by SRWMD
July 2020: As-Built Survey Cocoa Riverfront
Land and Sea Surveying provided an as-built survey in Cocoa Riverfront Park Promenade
June 2020: Surveying at Daytona Beach
Land and Sea Surveying provided surveying services surveying services inWilliamson Boulevard, Daytona Beach
May 2020: As-Built Surveys of Restrooms
Land and Sea Surveying provided surveying services toset benchmarks and establish elevations on existing benchmarks, measuring points, reference marksand staff gages at 20 sites
May 2020: Elevation Surveys at Monitoring Locations
Land and Sea Surveying provided as-built surveys of the new restrooms at Spessard Holland Park inMelbourne Beach
March 2020: ATX Building
Land and Sea Surveying completed a topographic survey, aerial drone survey and underground utility location with at the ATX building in Titusville, Florida.
March 2020: Sebastian Inlet A1A Easement
Land and Sea Surveying surveyed the provided legal description of the easement granted to the Florida Department of Transportation in July 1963 by locating the monumentation to accurately recreate the legal description.
February 2020: Tides Survey
Land and Sea Surveying surveyed the area outlined, locating all above-ground improvements and topography, Florida.
March 2020: Port Canaveral, FL.
Land and Sea Surveying completed a survey of 32 monitoring wells in Port Canaveral, Florida.
March 2020: Waccasassa River, FL.
Land and Sea Surveying completed a survey to assist scientists and environmental crews in establishing the elevation of different vegetation species along the Waccasassa River in North Florida.
March 2020: Coconut Grove, Florida
March 2020: Cape Canaveral, FL.
Land and Sea Surveying completed a boundary survey for the Scorpion Marina off Mullet Rd. in Cape Canaveral.
February 2020: Merritt Island, FL.
Land and Sea Surveying performed a topographic survey on multiple sites on Kennedy Space Center for the Institutional Power Systems Safety and Reliability Project.
February 2020: Indian River Crossings
Land and Sea Surveying completed a hydrographic survey of the crossings of the Indian River at Merritt Island Causeway (SR520) and Eau Gallie Causeway (SR518). Survey was collected with and Odom Echotrac CV-100 single beam system.
February 2020: Cape Canaveral Stormwater Systems
Land and Sea Surveying provided a survey to support the work on the stormwater system along five drainage structures that were replaced.
January 2020: Lhoist Lowell Quarry
Land & Sea Surveying surveyed the lake using a Teledyne Reson SeaBat T50-R multibeam survey system on our 25 ft. SAFEboat. The system was tied to an Applanix Wavemaster POS-MV for motion corrections and RTK GPS positioning. The multibeam system provides 100% coverage of the survey area.
January 2020: Cape Canaveral, FL.
Land and Sea Surveying conducted a survey for the Cape Canaveral Air Force Station to determine the erosion along approximately 4,500 feet of shoreline.
December 2019: Launch Complex Rebuild Cape Canaveral, Florida
Land and Sea Surveying performed a topographic survey of the Launch Complex for new construction.